The 70% rule is a screening formula for house flippers: take a property’s after-repair value (ARV), multiply it by 70%, and subtract the repair budget. The result is the highest purchase price the deal can support before financing, holding, selling costs, and profit take their share. It is a quick screen, not an appraisal or a guarantee of profit.
What is the 70% rule in house flipping?
The 70% rule is an offer ceiling based on the value the property will have after repairs, not the price it commands today. ARV comes from recent sales of renovated homes that match the subject in size, layout, and location. Repairs include materials, labor, permits, dumpsters, and a contingency for problems hidden behind walls.
The remaining 30% is the cushion. It has to absorb loan costs, property taxes, insurance, utilities, closing costs on the purchase and the sale, real estate commissions, and the profit the flip is meant to produce.
A price at the ceiling leaves room for those items. A price above it usually does not.
How do you calculate a maximum offer with the 70% rule?
Use this formula: maximum offer = ARV × 0.70 − repair costs. Multiply the ARV first, then subtract the full repair estimate. Do not subtract repairs from the ARV first and then take 70% of the smaller number; that produces a ceiling that is too low.
Step 1: Set the ARV from renovated comps
Pull several recent sales of homes that were already renovated, in the same neighborhood, with similar square footage and layout. Adjust for differences such as a garage, lot size, or extra bathroom. An ARV based on the best house on the street will push the maximum offer too high.
Step 2: Build the repair budget from a contractor walkthrough
Price the full scope: roof, HVAC, electrical, plumbing, kitchen, baths, flooring, paint, landscaping, permits, and dumpsters. Add a contingency for what you cannot see until walls open. Get written estimates from a licensed, insured contractor; the FTC warns about contractors who demand full payment up front or ask you to pull the permits.
Step 3: Multiply the ARV by 70% and subtract repairs
Run the arithmetic in that order and write down the result. The number is a ceiling for the purchase price, not a promise that the deal will close. If the ARV or the repair estimate is weak, the ceiling is weak too.
Step 4: Compare the ceiling with the seller’s price
If the asking price is below the ceiling, the deal may work. If it is above, negotiate, cut the repair scope, or walk. Do not treat the ceiling as a target; a lower purchase price leaves more margin for surprises.
What does the 70% rule look like in a worked example?
Take a hypothetical property with a $250,000 ARV and a $40,000 repair budget. Multiply $250,000 by 70% to get $175,000. Subtract $40,000 and the maximum offer is $135,000.
The 30% margin is $75,000, because $250,000 × 30% = $75,000. If selling costs are 6% of the sale price, they take $15,000, leaving $60,000 before financing, holding costs, and profit; a $150,000 purchase price is $15,000 above the ceiling, so that extra $15,000 comes straight out of the remaining margin.
Change the rule percentage and the answer moves. At 65%, the maximum offer is $122,500: $250,000 × 0.65 = $162,500, minus $40,000.
At 75%, it is $147,500: $250,000 × 0.75 = $187,500, minus $40,000. Same property, different cushion.
Why does the rule use 70% instead of the full ARV?
The 30% gap exists because a flip is not just purchase price plus repairs. The project has to carry financing, insurance, taxes, utilities, and closing costs while the work is done.
It also has to pay selling costs and produce a profit. The 70% rule puts those items into one quick test.
Financing is a real cost in 2026. Freddie Mac’s Primary Mortgage Market Survey had the 30-year fixed-rate mortgage averaging 7.11% as of 11/12/2026.
A flip loan often costs more than a regular owner-occupied mortgage, and the rate applies to a short-term balance. The rule does not calculate that payment for you; it reserves part of the 30% for it.
Holding time matters too. A project that takes longer than planned pays taxes, insurance, and loan interest for extra months.
The 30% cushion is not pure profit. On a $250,000 ARV, 30% is $75,000, and selling costs alone at 6% would use $15,000 of it.
That leaves $60,000 for financing, holding, closing, and profit.
When should you adjust the 70% rule?
Adjust the rule when the market, the rehab, or the financing changes the risk. Use a lower percentage when the market is slow or the rehab is heavy. Use a higher percentage when the market is strong and the work is mostly cosmetic.
| Situation | Rule used by some investors | Why it fits |
|---|---|---|
| Slow market or heavy rehab | 65% | More cushion for longer holding time and surprise repairs |
| Standard flip | 70% | Balanced cushion for costs and profit |
| Strong market or light cosmetic rehab | 75% or more | Less risk of hidden damage and faster resale |
A cash buyer may be able to pay above the 70% ceiling because there is no loan interest or lender fee inside the margin. That does not make a bad price good. The cash buyer still needs a profit after selling costs and taxes, and the ARV still has to be right.
Resale timing can change the buyer pool. HUD’s FHA property-flipping rule says a property resold 90 days or fewer after the seller’s acquisition is not eligible for an FHA-insured mortgage unless a listed exemption applies. If your exit plan depends on FHA buyers, a quick resale can narrow that pool.
What costs does the 30% margin need to cover?
The 30% margin has to cover every cost between purchase and sale, plus profit. That includes loan fees and interest, property taxes, insurance, utilities, permits, closing costs on the buy, closing costs on the sale, real estate commissions, and any staging or marketing. The CFPB lists common closing fees but does not publish a single percentage that fits every loan.
Selling costs are easy to underestimate: on a $250,000 sale, 6% in commissions and seller fees is $15,000, which is one-fifth of a $75,000 margin. Add holding months of taxes, insurance, and loan interest, and the remaining profit can shrink fast. The rule does not itemize these costs; it forces you to leave room for them.
Financing costs vary by lender and loan structure. Hard money and fix-and-flip loans are priced for short-term risk, so the rate and fees can be higher than a regular mortgage.
The 30% cushion is where those costs come from. A lender’s appraisal is a second check on your ARV; if it comes in lower, the loan amount can fall and the deal can fail.
What are common mistakes when using the 70% rule?
The biggest mistakes are trusting a weak ARV, underpricing repairs, and treating the maximum offer as a target.
- Using the best house on the street as the ARV. Renovated comps must match the subject’s size, layout, and location.
- Guessing repairs from photos. A contractor walkthrough and a contingency catch what photos miss.
- Offering the exact ceiling. The ceiling is the most the deal can bear, not the price to chase.
- Forgetting the 30% is not profit. Financing, holding, closing, and selling costs come out first.
- Inflating ARV or repair numbers on a loan application. The IRS notes that property flipping is not legal when it involves false statements to a lender.
- Using the rule on a rental. A rental is judged by cash flow and return, not by resale margin.