A construction-to-permanent loan is a single mortgage that covers construction costs and then becomes the permanent mortgage after the home is finished. The lender closes once, advances money in draws as work progresses, and then converts the loan to a long-term mortgage. That saves a second application and a second set of closing costs, but it also ties you to one lender’s permanent terms.

How does a construction-to-permanent loan work?

It works as one loan with two phases: a short construction phase and a long permanent phase. During construction, the lender releases funds in draws after inspections, and you typically pay interest only on the amount drawn.

When the home is complete and passes final inspection, the loan converts to a standard mortgage. The interest-only payment ends, and principal repayment begins. Ask for the conversion formula in writing before you close.

The permanent payment includes principal and interest, and may include escrow for taxes and insurance. See how mortgage payments work for the parts of a payment.

A draw is a payment to the builder for a completed stage, such as foundation, framing, or roofing. The lender sends an inspector before releasing each draw. The inspection confirms the work matches the draw request.

Slow inspections or missing paperwork can stall the build, so the draw calendar belongs in your contract. Ask for the inspection and draw timeline in writing before you sign.

At conversion, the loan stops being a construction loan and becomes a standard mortgage. The interest-only payment ends, and principal repayment begins. Ask for the conversion formula in writing before you close.

How is it different from a two-close construction loan?

A two-close loan uses a separate construction loan and a separate permanent mortgage; a one-time close combines them. With two closings, you can shop for the permanent loan after the home is built.

But you pay two sets of closing costs and face the risk that rates, your income, or your credit change before the second closing. A one-time close avoids that second closing, but you must accept the lender’s permanent-loan terms at the start.

The structure matters most when rates move. A one-time close can protect you from a higher permanent rate later if you lock early. A two-close loan can help if you expect your financial profile to improve before the permanent loan.

Bank of America’s cited page describes a separate construction loan followed by permanent financing, not a single-close loan. Read the product name carefully.

Who each suits:

  • One-time close: buyers who want one closing and certainty about the permanent lender.
  • Two-close: buyers who want to shop later or whose credit or income will change.
  • Builder financing: buyers who accept the builder’s preferred lender in exchange for a smooth draw process, but who should still compare the permanent terms.

Which lenders offer construction-to-permanent loans?

Several banks and mortgage lenders offer one-time-close construction loans, but published terms vary widely. The table below uses only details the lenders publish, so it is a starting point, not a ranking.

LenderPublished detailWhat it means for a borrower
U.S. BankConstruction phase usually 12–18 monthsA longer build window for complex builds
Regions BankLoan amounts up to $2 million; 90% loan-to-value on loan amounts up to $1 million; rate lock up to 360 daysStrong fit for larger builds and borrowers who want a long rate lock
Fifth Third BankDown payment as low as 10%; converts to a 15- or 30-year permanent mortgageLower cash requirement for qualified borrowers
New American FundingConstruction phase typically 6–12 months; minimum credit score 580–620 depending on loan type; down payment 0%–20%Suits shorter builds and a range of down payments
WaFd Bank9.899% APR on its Texas construction loan calculator; owner-occupied homes onlyA published rate example, but it is state-specific and not a national quote

The table skips a key question: what happens after the construction phase. U.S.

Bank and Fifth Third describe automatic conversion to a permanent mortgage. Regions and New American Funding describe a one-time close with interest-only payments during construction.

WaFd says the construction loan automatically becomes a mortgage once construction is complete. Ask each lender whether the permanent rate is locked, how long the lock lasts, and what happens if the build runs late.

What are the steps to get a construction-to-permanent loan?

Start with a lender preapproval, then choose a builder, submit plans and a budget, close once, manage draws, and convert to the permanent mortgage. The order matters because a builder who is not acceptable to the lender can force you to start over.

Step 1: Get preapproved before you shop for a builder

The lender reviews income, assets, credit, and down payment. U.S.

Bank says it reviews credit score, debt-to-income ratio, income, down payment, and credit history. A preapproval sets your loan range and flags credit issues early, but the property and builder still must pass.

Step 2: Choose a qualified builder and sign a contract

Lenders want proof the builder is licensed, insured, and financially able to finish. Fifth Third requires proof of a qualified builder; Citizens Bank requires a licensed builder; U.S.

Bank requires an established builder. The contract should include a fixed scope, a draw schedule, change-order rules, and a completion date.

Step 3: Submit plans, specs, and a line-item budget

The lender uses the plans, specifications, and cost breakdown to set the loan amount and the draw schedule. Missing items such as permits, site work, or utility connections can reduce the loan or delay closing. A low appraisal can require more cash or a smaller build.

Step 4: Close once on the construction and permanent loan

At a one-time close, you sign documents for both phases. Review the Loan Estimate line by line before you sign. Regions Bank says its one-time close avoids a second set of closing costs and has no prepayment penalty.

You may pay an up-front rate-lock fee, which Regions says may be partly or fully credited at closing. Ask whether the fee is refundable if the loan does not close.

Step 5: Manage draws and inspections

The builder requests a draw when a stage is complete. The lender inspects the work before releasing money. PNC Bank says inspections are usually obtained within 48 hours of notice and the draw is made within 24 hours after the inspection report and required documents arrive.

That timeline is a service target, not a guarantee. Keep a contingency fund for change orders and delays.

Step 6: Convert to the permanent mortgage

After the final inspection and certificate of occupancy, the loan converts. Payments change from interest-only to principal and interest. Check the first permanent statement to confirm the rate, term, and escrow amount.

See what escrow is if your payment includes taxes and insurance. Ask the lender to explain any difference between the construction-phase payment and the permanent payment.

What fees and closing costs should you expect?

Expect one set of closing costs, plus inspection fees, rate-lock fees, and possibly a funding fee or prepayment penalty. A one-time close saves the second closing, but it does not make closing free.

U.S. Bank offers a client credit of 0.25% of the loan amount, up to $750, when autopay is set up from a U.S.

Bank personal checking account before final approval. PNC Bank typically requires three prepaid inspections for renovation and six for construction; additional inspection fees may be charged.

Regions Bank says its one-time close has no second set of closing costs and no prepayment penalty, and an up-front rate-lock fee may be partly or fully credited at closing. Wells Fargo requires a non-refundable extended rate-lock fee, but the amount is not shown on its cited page.

Inspection fees are easy to miss because they are paid during the build, not at closing. Each draw may trigger an inspection, and the lender may charge for re-inspections if work is incomplete. Ask for the inspection fee schedule and whether the fee is collected upfront or deducted from a draw.

Ask whether the lender charges a separate fee to convert the loan to the permanent phase. Get the answer in writing so it does not appear as a surprise at closing.

Who is a construction-to-permanent loan best for?

It fits buyers who have a builder, approved plans, and a clear timeline, and who want one closing. It works best when you can cover interest-only payments during construction and still qualify for the permanent payment after conversion.

The loan is a poor fit for someone who may need to change builders, has no budget cushion, or wants to shop for the permanent mortgage after the home is built. It also favors borrowers who can accept a payment jump at conversion.

It also suits borrowers who want a long rate lock. Citizens Bank can lock the permanent rate up to 18 months in advance, and Bank of America can lock for up to 12 months during construction.

A long lock can protect the permanent rate, but it may cost a fee and may not cover every delay. Compare the lock fee with the risk of a higher rate at conversion.

What are the common mistakes?

Most problems come from timing, builder approval, and budgeting for the wrong payment.

  • Choosing the builder before the lender. A builder who is not approved by the lender can delay or kill the loan. Get preapproved first, then confirm the builder meets the lender’s requirements.
  • Budgeting for the interest-only payment. The permanent payment is higher because it includes principal. In the example below, the permanent payment is more than double the interest-only payment.
  • Letting the rate lock expire. A 360-day lock or an 18-month lock can still run out if the build stalls. Ask what happens if construction runs past the lock period.
  • Skipping the contingency line. Change orders, re-inspections, and material delays can push the project over budget. The lender may not increase the loan, so the extra cash comes from you.
  • Assuming a published APR is your rate. WaFd’s 9.899% APR is on a Texas calculator for owner-occupied homes. It is not a national quote or a guarantee for your loan.

What does a construction-to-permanent loan cost? A worked example

Use the permanent mortgage payment, not the interest-only payment, to judge affordability. This is a hypothetical example, not a lender quote.

Suppose you borrow $400,000 at 7% interest. During a 12-month construction phase, assume the average outstanding balance is $200,000. The interest-only payment is $200,000 × 0.07 ÷ 12 = $1,166.67 per month.

After conversion, a 30-year fixed loan at 7% on $400,000 has a principal-and-interest payment of $2,661.21. Check the first permanent payment: $400,000 × 0.07 ÷ 12 = $2,333.33 goes to interest, and $2,661.21 − $2,333.33 = $327.88 goes to principal.

The permanent payment is $1,494.54 higher than the interest-only payment in this example. That jump is the number to budget for, not the construction-phase payment.

If the build runs long, the interest-only phase can last longer than planned. More months of interest-only payments mean less principal reduction and more total interest. A longer build also raises the chance that the rate lock expires.

Keep a separate cash reserve for delays. Ask the lender how it handles a construction extension before you need one.