Loan to cost (LTC) is a ratio that compares the amount you borrow to the total cost of a real estate project, including the purchase price, the rehab budget, and the fees paid to close. You calculate it by dividing the loan amount by total project cost. If a lender funds $300,000 against $400,000 of total cost, the LTC is 75%.

LTC matters most on short-term deals: fix and flips, bridge loans, and construction projects. A long-term rental mortgage is usually judged on loan to value instead, because the property already exists and the appraised value is the anchor. On a project, the cost is the anchor, and the cost is where budgets slip.

How do you calculate loan to cost?

The formula is one division: loan amount divided by total project cost. The work is in building an honest cost figure, because LTC punishes a thin budget. If you leave out closing costs or the holding costs during the rehab, the ratio looks better than the deal really is.

Loan to cost = Loan amount / Total project cost

Total project cost = Purchase price + Rehab budget
                   + Closing costs + Loan fees and points
                   + Carrying costs + Contingency

Run the numbers on a hypothetical deal. Say the purchase price is $310,000, the rehab budget is $60,000, closing costs are $8,000, loan fees and points are $7,000, and holding costs during a four-month project are $15,000.

That adds up to $400,000. A $300,000 loan against that $400,000 is 75% LTC, and the borrower brings $100,000 in cash.

Check the arithmetic: 300,000 divided by 400,000 is 0.75, or 75%. The cash in is the difference, $100,000, which is 25% of the cost. The two percentages always add to 100% when the loan plus cash equals the total cost.

What counts as total project cost?

Total project cost is every dollar the project consumes before it is sold or refinanced. Lenders want it itemized, and they will compare your budget against their own estimate and against comparable sales. The line items below are the ones that show up on nearly every project budget.

  • Purchase price. The contract price plus any buyer-side closing costs.
  • Rehab budget. Materials, labor, permits, and a line for the unexpected.
  • Loan fees and points. Origination, points, appraisal, and title.
  • Carrying costs. Interest, property taxes, insurance, and utilities during the project.
  • Contingency. A reserve for overruns, usually a set share of the rehab budget.
  • Selling costs, if you count them. Agent commission and transfer costs on the exit.

Whether you count selling costs is a judgment call. Some lenders exclude them from LTC and apply a separate cap on the after-repair value. Ask which definition the lender uses before you compare offers, because the same deal can show a different LTC under each.

Why do lenders use loan to cost?

Lenders use LTC because it measures how much of their money is exposed relative to the whole project, not just the property. A borrower with 25% or 30% of the cost in cash has a real reason to finish the job and sell at a strong price. That cushion also absorbs overruns before the lender takes a loss.

Cost-based lending shows up across product types. FHA loans carry a 1.75% upfront premium plus an annual premium of 0.55% on most 30-year loans with less than 5% down, and those costs are part of what a borrower finances.

On short-term deals, bridge loans commonly run 8% to 12% plus 1 to 2 points, and those charges belong in the cost side of the ratio. You can see how those fees stack up in our guide to how hard money loans are priced.

How do you calculate LTC step by step?

Work the numbers in a fixed order so nothing gets skipped. Each step feeds the next, and the final two steps give you the ratio and the cash you need at closing.

Step 1: Add up the purchase price and rehab budget

Start with the two biggest numbers. The purchase price comes from the contract.

The rehab budget comes from your contractor’s line-item estimate, not a round figure. Add a contingency on top of the rehab, because projects rarely finish on budget.

Step 2: Add closing costs and loan fees

Closing costs cover title, escrow, recording, and the lender’s appraisal and underwriting. Loan fees include origination and points. If the lender charges 1 to 2 points on a $300,000 loan, that is $3,000 to $6,000 added to cost before interest.

Step 3: Add carrying costs for the project term

Carrying costs are the monthly bills while you hold the property: interest, taxes, insurance, and utilities. Multiply the monthly figure by the number of months the project will run, then add a buffer for delays. On a four-month project with $3,750 a month in carrying costs, that line is $15,000.

Step 4: Divide the loan by the total cost

Take the loan amount the lender offers and divide it by the total you built in steps 1 through 3. The result is the LTC. If the loan equals the full cost, LTC is 100%, which almost never happens on a project loan.

Step 5: Subtract to find your cash in

Subtract the loan from the total cost. That difference is the cash you must bring, and it is the number to check against your available funds before you sign anything. A deal can look profitable and still fail because the cash gap is bigger than the borrower’s reserves.

Worked example: LTC versus LTV on the same deal

Take a property bought for $310,000 with a $60,000 rehab. Total cost, including $30,000 of fees and carrying costs, is $400,000.

The lender approves a $300,000 loan. LTC is 75%.

After the rehab, the property appraises at $480,000, so loan to value is 300,000 divided by 480,000, or 62.5%.

The gap between 75% and 62.5% is the value the rehab created. That gap is why fix and flip lenders watch both ratios: LTC caps how much they lend at the start, and LTV caps how much exposure remains once the work is done. Our guide to loan to value ratio covers the LTV side in detail.

Now test the deal against the 70% rule. The after-repair value is $480,000, and 70% of that is $336,000.

Subtract the $60,000 rehab and the maximum offer is $276,000. The purchase at $310,000 is above that line, which means the deal is thin even though the LTC of 75% looks acceptable.

The 70% rule guide explains how to use that test as a screen before you order an appraisal.

What is a good loan to cost ratio?

There is no universal cutoff, but fix and flip and bridge lenders commonly cap LTC around 70% to 80%. That means the borrower funds 20% to 30% of the cost in cash. Deals at the low end of that range usually get better pricing and more lender interest.

A lower LTC is not automatically better for the borrower. Putting more cash in reduces the loan and the interest, but it also ties up capital that may be needed for the next deal. The right number balances the lender’s cap against your own reserve, and your reserve should cover the carrying costs if the project runs long.

On a bridge loan, the full balance comes due at the end. Our bridge loans guide walks through how the balloon payment interacts with the loan amount, which is the same figure you use in the LTC calculation.

Common mistakes

Using the purchase price as the cost. The purchase is only one line. Rehab, closing costs, points, and carrying costs all belong in the denominator, and leaving them out understates LTC.

Forgetting points and fees on short-term loans. Bridge loans commonly run 8% to 12% plus 1 to 2 points. On a $300,000 loan, 1.5 points is $4,500, and that money comes out of the deal’s profit.

Confusing LTC with LTV. LTV divides the loan by appraised value. On a project, the value changes after the rehab, so a deal can show a comfortable LTV and a tight LTC at the same time.

Skipping the contingency. A rehab with no reserve for overruns turns a 75% LTC into something higher the first time a contractor finds a problem behind a wall.

Not checking the exit. On a fix and flip loan, the profit has to cover the borrowing cost, the selling costs, and the cash you put in. If the resale price comes in low, the LTC cushion is what keeps the deal from going underwater.