A flip’s maximum offer is the highest purchase price that still leaves room for repairs, holding costs, selling costs, financing, and profit. The common shortcut is the 70% rule: after-repair value × 70% − repair costs.

That formula gives a ceiling, not a target. The number is only as reliable as the ARV and the repair estimate behind it.

What is the 70% rule formula for a flip?

The formula is ARV × 70% − repair costs = maximum offer. ARV means after-repair value, the expected sale price once the renovation is finished.

The rule percentage is adjustable. A slow market or a heavy rehab may call for 65%.

A light rehab in a strong market may support 75%. The table shows how the choice changes the same deal.

RuleMath on a $320,000 ARV and $50,000 of repairsMax offer
65%$320,000 × 0.65 = $208,000; $208,000 − $50,000$158,000
70%$320,000 × 0.70 = $224,000; $224,000 − $50,000$174,000
75%$320,000 × 0.75 = $240,000; $240,000 − $50,000$190,000

The 30% left over is not profit alone. It has to cover financing, holding costs, closing costs on both sides, selling costs, and the profit you need for the risk. On a $320,000 sale, 6% in selling costs alone is $19,200, which is a fifth of the $96,000 margin.

That is why a deal can hit the formula and still lose money if costs run high.

How do you calculate the after-repair value?

The ARV is the price the renovated home should sell for, based on recent sales of similar homes in the same area. Use sold comps, not active listings, and adjust for size, layout, condition, and upgrades.

Choose comps from the same neighborhood with similar age, bedroom count, and living area. A house with an extra bathroom or a finished basement is not a direct comp, so adjust the sale price up or down before you set the ARV.

An ARV based on the nicest house on the street will produce a maximum offer that is too high. The 70% rule guide explains why a shaky ARV breaks the formula.

How do you estimate repair costs?

Price the full scope of work, including permits, materials, labor, and a contingency for hidden problems. Every dollar the repairs are underpriced becomes a dollar the maximum offer is too high.

Walk the property with a contractor and price the work needed to reach the ARV. Big-ticket items such as the roof, HVAC, electrical, plumbing, and kitchen or bath remodel deserve separate bids.

Cosmetic upgrades that do not raise the ARV still belong in the repair budget, because they consume cash and margin. Permits and inspection corrections can add cost after the contractor’s first bid.

How do you calculate max offer for a flip step by step?

Start with a defensible ARV, build a realistic repair budget, choose a rule percentage, run the formula, and stress-test the result against costs and financing. The steps below show the sequence.

Step 1: Set the after-repair value

Use recent sold comps in the same neighborhood and adjust for differences. Write the ARV as a single number, not a range, so the formula has a clear input.

Step 2: Build the repair budget

List the work by category, price it with a contractor, and add a contingency. The repair number in the formula should cover the work needed to reach the ARV, not extra upgrades you hope to add.

Step 3: Choose the rule percentage

Use 70% as the default. Move to 65% in a slow market or for a heavy rehab, and use 75% only for light rehabs in strong markets where the ARV is well supported.

Step 4: Run the formula

Multiply the ARV by the rule percentage, then subtract repairs. On a $320,000 ARV with $50,000 of repairs at 70%, the math is $320,000 × 0.70 = $224,000; $224,000 − $50,000 = $174,000.

Step 5: Stress-test the offer

Compare the max offer with the asking price and with your financing. A $174,000 ceiling still needs a loan and down payment that work; the formula does not approve the deal.

A cash buyer can afford to pay more than the rule allows, because there are no financing costs eating into the 30% margin. The rule still protects against overpaying for the property itself.

What costs must the 30% margin cover?

The 30% is not profit alone. It must cover financing, holding costs, closing costs on both sides, selling costs, and the profit you need for the risk.

  • Financing: loan points, interest, and lender fees.
  • Holding: property taxes, insurance, utilities, and maintenance while you own it.
  • Selling: agent commission, closing costs, and buyer concessions.
  • Profit: compensation for the risk and time.

A cash buyer removes financing costs from the margin, so the same ARV can support a higher offer. A leveraged buyer needs a lower offer or a cheaper loan to keep the margin intact. The fix and flip loans guide covers how loan costs affect the math.

Delays also eat the margin. A rehab that runs long pays taxes, insurance, utilities, and loan interest for extra months, even if the repair budget itself holds.

How does financing change the maximum offer?

Financing costs come out of the 30% margin, not the repair line. Higher loan points, interest, and lender fees reduce the purchase price you can afford at the same ARV.

A lender may not accept your ARV, and that can shrink the loan or kill the application. The hard money pricing guide breaks down the cost components that compete with your profit.

How do market conditions and rehab size change the rule?

They change the rule percentage, not the formula. A slow market or a heavy rehab calls for 65%; a light rehab in a strong market can support 75%.

The rule is a rule of thumb, not a hard rule. The same property can justify different percentages depending on local demand, the size of the rehab, and how confident you are in the ARV.

Small changes move the answer a lot. If the ARV were $300,000 instead of $320,000, the max offer would be $160,000. If the repairs cost $70,000 instead of $50,000, the max offer would be $154,000.

What if the seller wants more than your max offer?

If the asking price is above your max offer, the deal probably is not a flip at that price. Walk away, negotiate the price down, cut the repair cost, or find a way to raise the ARV with a better plan.

On the $320,000 example, an asking price of $200,000 is $26,000 above the $174,000 ceiling. That $26,000 has to come out of the profit, the contingency, or your own pocket.

Cash does not make a bad price good. A higher offer can still be a bad deal if the margin cannot absorb the costs and surprises.

Common mistakes

  • Trusting a shaky ARV. An ARV based on the nicest house on the street will produce a maximum offer that is too high.
  • Underpricing repairs. Every dollar the repairs are underpriced becomes a dollar the maximum offer is too high.
  • Treating the ceiling as a target. The maximum offer is the most the deal can bear, not the price you should aim for.
  • Forgetting the 30%. Financing, holding, closing, and selling costs all come out of the margin before profit.
  • Using the rule on a rental. The rule is designed for flips; for a rental, cash flow matters more than the resale margin.